Integral Logistics Management — Operations Management and Supply Chain Management Within and Across Companies

Case (Courses 13, 14 and 15)


Case Study: (to follow)


German Version

wird nachfolgen

Attachment

English Version

to follow ....

Attachment



Course 15: Sections and their intended learning outcomes

  • Course 15 – Order Release and Control

    Intended learning outcomes: Differentiate various techniques for order release. Explain in detail shop floor control. Present methods and techniques used for order monitoring and shop floor data collection. Describe distribution control.

  • 15.1 Order Release

    Intended learning outcomes: Describe order proposals for production and procurement as well as order release. Explain load-oriented order release (Loor) and capacity-oriented materials management (Corma).

  • 15.2 Shop Floor Control — Production Activity Control (PAC) — Manufacturing Execution System (MES)

    Intended learning outcomes: Describe the issuance of accompanying documents for production. Explain operations scheduling, dispatching, and finite forward scheduling. Present sequencing methods.

  • 15.3 Order Monitoring and Shop Floor Data Collection

    Intended learning outcomes: Describe recording issues of goods from stock and completed operations. Produce an overview on progress checking, quality control, report of order termination, and automatic and rough-cut data collection.

  • 15.4 Distribution Control

    Intended learning outcomes: Explain order picking, packaging, load building, and transportation to receiver.

  • 15.5 Summary

    .

  • 15.6 Keywords

    .

  • 15.7 Scenarios and Exercises

    Intended learning outcomes: Calculate examples for load-oriented order release (Loor) and for finite forward scheduling. Assess characteristics of capacity-oriented materials management (Corma) and of order Picking.